Title |
The Diagnostic System at the European XFEL; Commissioning and First User Operation |
Authors |
- D. Nölle
DESY, Hamburg, Germany
|
Abstract |
The European XFEL is now commissioned and user operation has started. Long bunch trains up to 300 bunches are established. The role of and experience with the beam diagnostic will be reported. Highlights, problems and their solutions will be discussed.
|
Paper |
download TUOA01.PDF [0.811 MB / 7 pages] |
Slides |
download TUOA01_TALK.PDF [8.932 MB] |
Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
Conference |
IBIC2018 |
Series |
International Beam Instrumentation Conference (7th) |
Location |
Shanghai, China |
Date |
09-13 September 2018 |
Publisher |
JACoW Publishing, Geneva, Switzerland |
Editorial Board |
Volker RW Schaa (GSI, Darmstadt, Germany) |
Online ISBN |
978-3-95450-201-1 |
Received |
04 September 2018 |
Accepted |
11 September 2018 |
Issue Date |
29 January 2019 |
DOI |
doi:10.18429/JACoW-IBIC2018-TUOA01 |
Copyright |
Published by JACoW Publishing under the terms of the Creative Commons Attribution 3.0 International license. Any further distribution of this work must maintain attribution to the author(s), the published article's title, publisher, and DOI. |
|