Title |
Commissioning and Restart of ESRF-EBS |
Authors |
- S.M. White, N. Carmignani, L.R. Carver, J. Chavanne, L. Farvacque, L. Hardy, J. Jacob, G. Le Bec, S.M. Liuzzo, T.P. Perron, Q. Qin, P. Raimondi, J.-L. Revol, K.B. Scheidt
ESRF, Grenoble, France
|
Abstract |
The ESRF operates a 6 GeV 4th generation light source, the ESRF-EBS. This storage ring is the first to implement the Hybrid Multi-Bend Achromat lattice (HMBA). The HMBA lattice provides a reduction of the horizontal emittance of approximately a factor 30 with respect to the former Double Bend Achromat (DBA) structure, considerably improving the brilliance and transverse coherence of the ESRF accelerator complex while maintaining large horizontal acceptance and excellent lifetime performance. In this report, the characteristics of the HMBA lattice will be reviewed and the beam commissioning results and first operation experience of the new ESRF storage ring will be presented.
|
Paper |
download MOXA01.PDF [1.452 MB / 6 pages] |
Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
Conference |
IPAC2021 |
Series |
International Particle Accelerator Conference (12th) |
Location |
Campinas, SP, Brazil |
Date |
24-28 May 2021 |
Publisher |
JACoW Publishing, Geneva, Switzerland |
Editorial Board |
Liu Lin (LNLS, Campinas, Brazil); John M. Byrd (ANL, Lemont, IL, USA); Regis Neuenschwander (LNLS, Campinas, Brazil); Renan Picoreti (LNLS, Campinas, Brazil); Volker R. W. Schaa (GSI, Darmstadt, Germany) |
Online ISBN |
978-3-95450-214-1 |
Online ISSN |
2673-5490 |
Received |
11 May 2021 |
Accepted |
31 August 2021 |
Issue Date |
01 September 2021 |
DOI |
doi:10.18429/JACoW-IPAC2021-MOXA01 |
Pages |
1-6 |
Copyright |
Published by JACoW Publishing under the terms of the Creative Commons Attribution 3.0 International license. Any further distribution of this work must maintain attribution to the author(s), the published article's title, publisher, and DOI. |
|